SAFETY • QUALITY • TRACEABILITY
SAFETY & QUALITY
Safe Work, Documented Quality and Traceable Equipment — Built Into How We Supply, Fabricate and Stage Mechanical Projects.
DISCUSS YOUR PROJECT REQUIREMENTS →SAFETY PRACTICES CLIENTS EXPECT
Fall protection & rigging: Rooftop equipment, crane picks and high-bay duct installation demand fall protection, rigging plans and qualified signal persons.
Refrigerant & pressure safety: Refrigerant handling by EPA Section 608-certified technicians; pressure testing, relief-device and boiler safety procedures.
Confined spaces & excavations: OSHA 29 CFR 1926 Subpart AA and Subpart P controls for tunnel, vault, sump and underground work.
Site-specific safety plans: Written plans, hazard communication, hot-work permits, lockout/tagout and training records aligned with OSHA's recommended practices for construction.
QUALITY & DOCUMENTATION
Submittals to approved drawings: Product data, performance tables, shop drawings and 3D coordination reviewed against the specification before release.
Duct & pipe testing: Duct-leakage, pressure, hydrostatic and flushing tests documented separately from TAB.
Material traceability: MTRs, UL / AHRI listings, cut sheets and BABA documentation available when specified on the PO.
Commissioning & turnover: Start-up checklists, functional-performance records, O&M data and owner training materials (ASHRAE Guideline 0).
OSHA is the baseline. HVAC technicians have among the highest injury and illness rates of any occupation (BLS), so owner prequalification (EMR, TRIR/DART, OSHA history) is typical.