DIVISION 05 • MISSION-CRITICAL
DATA CENTER & MISSION-CRITICAL MECHANICAL SUPPORT
Equipment Procurement, Prefabrication and Staging for Fast-Track Cooling and Heat-Rejection Systems.
REQUEST A DATA CENTER QUOTE →MISSION-CRITICAL CAPABILITIES
Cooling Plant Equipment
Chillers, CRAH / CRAC units, cooling towers, dry coolers, pumps, heat exchangers and VFDs procured early and staged against long equipment lead times.
Liquid-Cooling Piping Support
Stainless and compatible-material piping, valves, manifolds and supports for CDU and direct-to-chip loops, with cleanliness and flushing documentation.
Prefabricated Assemblies
Skids, pipe racks, manifolds and support systems prefabricated to shop drawings to cut field labor on repetitive data-hall scopes.
Phased Staging & Releases
Warehouse staging and just-in-time, zone-by-zone releases that keep fast-track data-hall schedules moving.
WHAT WE SUPPORT ON DATA CENTER PROJECTS
Chilled-water & heat-rejection plants: redundant chiller and tower plants, condenser-water and glycol systems, and the supports and platforms around them.
Air-side cooling: CRAH / CRAC units, fan walls, containment and ductwork components.
Liquid-cooling distribution: CDUs, secondary-loop manifolds, quick-connect hardware and leak-detection components sourced to the OEM / IT-vendor requirement.
Clean piping practice: clean-install, flushing, fluid-quality verification and air-removal documentation per ASHRAE TC 9.9 guidance.
Generator & fuel-system mechanical: exhaust, ventilation and fuel piping materials coordinated with the electrical package.
Power-adjacent coordination: XKR Electrical can supply conduit, cable, enclosures and distribution gear for the same project.
Commissioning support: functional-performance and integrated-systems testing access, documentation and spares.
Security & site hardware: bollards, fencing, gates and enclosure hardware fabricated in stainless, aluminum or steel.
MARKET CONTEXT & PRACTICE
Spending surge:U.S. data-center construction spending was up about 90% year over year in September 2026 (Census / AGC).
Supply constraints:power availability, permitting and equipment lead times are the main constraints (FMI).
Local policy:Chesapeake and Virginia Beach have restricted or paused new data centers (Aug 2026); Northern Virginia remains the largest regional market.
ASHRAE TC 9.9:guidance for liquid-cooling installation, flushing and testing under design load before IT connection.
WHAT TO INCLUDE WITH YOUR RFQ
- Cooling concept, one-line mechanical diagram and equipment schedule
- OEM / IT-vendor liquid-cooling requirements
- Phasing, hall-by-hall delivery and security requirements
- Target delivery and staging requirements
REQUEST A DATA CENTER QUOTE →
Or call 804-384-0211 • 888-384-0121